johnnytsi
20+ Year Contributor
- 176
- 9
- Aug 20, 2002
-
Everett,
Washington
Any progress on letting this out yet??
I have everything required to get my 1g converted. The head has been drilled/tapped/Cleaned and is ready to be bolted on.
I have all of the mivec control valve bits and pieces sorted out and ready.
I've performed some initial adjustments/measurements for valve to valve clearance and am ready to start valve to piston clearance checks.
I've got a couple of other challenges to deal with as my transmission and torque converter are out being freshened up.
My hope is to have everything working by the end of the month.