- Thread starter
- #51
techboy
5+ Year Contributor
- 541
- 436
- Feb 3, 2018
-
Lehigh Valley,
Pennsylvania
-AN HP FUEL FEED LINE BUILD
With the undercoating done, now it was time to get going on all things fuel related. I wasn't originally planning to do this, but I decided last minute to order AN fittings and rebuild the HP feed line.
On the left is the OEM line, on the right is all the new parts.
I first measured and cut the amount of fuel line I needed.
Twisted the AN end onto the fuel line.
Loaded it up in this holder I made.
Threaded in the swivel end of the AN fitting.
Installed!
Repeated the process for the other end and then moved onto installing the metric to AN adapters.
20 minutes later and I got a fresh HP fuel feed line ready to go!
With the undercoating done, now it was time to get going on all things fuel related. I wasn't originally planning to do this, but I decided last minute to order AN fittings and rebuild the HP feed line.
On the left is the OEM line, on the right is all the new parts.
I first measured and cut the amount of fuel line I needed.
Twisted the AN end onto the fuel line.
Loaded it up in this holder I made.
Threaded in the swivel end of the AN fitting.
Installed!
Repeated the process for the other end and then moved onto installing the metric to AN adapters.
20 minutes later and I got a fresh HP fuel feed line ready to go!
Last edited: